Customization: | Available |
---|---|
Warranty: | 2 Years |
Application: | Workshop Crane, Shipboard Crane, Warehouse Crane, Building Crane, Factory |
Still deciding? Get samples of US$ 2000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.We can design the customerized vertical goods lift as per your requirement.
2.The most suitable model will be recommended to you once we know about your requirement.
3.Shipment can be arranged from our port to your destination port.
4.Operation video can be sent to you if needed.
5.Maintenance video will be given once the vertical goods lift breaks down to help you repair.
6.Parts of vertical goods lift can be sent to you by express within 7 days if needed.
Frequently Asked Questions:
1.How can customer buy parts once it break down?
The vertical goods lift adopt most of the common parts of hardware.You can buy the parts in your local hardware market.
2.How can customer repair the vertical goods lift.
One of the great advantage of the equipment is with very very low failure rate.Even it breaks down,we can guide to repair it by video and repair instruction.
3.How long is the quality guarantee?
One year quality guarantee.If it breaks down within one year,we can send the parts free of charge to you.
Certificate:ISO and CECustomers only need to fixed the two guide rails to the ground and wall by expansion bolt. Thee main parts includes electric motor ,hydraulic pump station and hydraulic cylinder. So it is very easy to maintain. And the failure rate is extremely low. This kind of cargo lift will save much maintenance cost for customers.
Load capacity from 200kg to 2000kg,lifting height from 2m to 15m.Two guide rails cargo lift platform doesn't have standard model. We all make the platform size, load capacity and max platform height as per customer's requirement.
Safety
1.Spillover valve, it can prevent high pressure when the vertical goods lift moves up.
2.Manual emergency valve, it can go down to the nearest floor and open the door when you meet an emergency.
3.Pipe explosion valve, when the hydraulic system pipe fractures, it can cut down the channel of the oil to stop it falling.
4.Temperature protection, when the temperature of the hydraulic oil exceed standard, the machine will stop working until the temperature gets back to standard.