8m to 12m Light Weight Towable Aerial Lift Platforms elevated work platform
Dual Mast Aluminum Lift Platform is developed from Single Mast Aluminum Lift Platform. Compared with single mast aluminum lift platform, dual mast lift platform load capacity is 200kg,lifting height from 6m to 14m.
Introduction:
Moving by man manully.
Lifting by AC(without battery) power or DC(with battery) power
AC: Voltage as per your local standard.
DC: Battery supply power.
Configuration:
Up-down control box on side of the body
Up-down control panel on the platform
Stable hydraulic pump station
High quality electric motor
High strength hydraulic cylinder
Self-lock support legs
Travel switch
High strength chains
Optional Configuration:
Remote control
Durable battery
.
Safety of Electrical and hydraulic System
Ergonomic control panel, power indicator, electric shock protector, circuit breaker etc.
Built in pressure release valve
Emergency stop buttons are available both on the platform and on the low position.
Emergency lowering device
Broken valve activated automatically to stop the flowing of hydraulic oil in case any pipe broken.
Specification:
Model |
DMA06 |
DMA08 |
DMA10 |
DMA12 |
Max. Platform Height |
mm |
6000 |
8000 |
10000 |
12000 |
Max.Working Height |
8000 |
1000 |
12000 |
14000 |
Min. Platform Height |
1800 |
2020 |
Ground Clearance |
80 |
Lift Rated Capacity |
kg |
200 |
200 |
200 |
Platform Size |
mm |
1230*620 |
1430*620 |
1530*620 |
Outspread Size |
1880*1760 |
2220*1960 |
2250*2750 |
Electrical Source |
AC |
v |
as per customers' requirement |
DC |
12 |
Aneroid Battery |
v/Ah |
150 |
Charger |
v/A |
12/15 |
Lifting Motor |
AC |
v/kw |
1.5 |
DC |
2.5 |
Overall Length |
mm |
1560 |
1790 |
1840 |
Overall Width |
840 |
890 |
Overall Height |
1860 |
2080 |
Overall |
AC |
kg |
500 |
580 |
650 |
750 |
Net Weight |
DC |
530 |
610 |
680 |
780 |
Pictures for Your Review:
Our Service:
1.We can design the customerized aerial man lift platform as per your requirement.
2.The most suitable model will be recommended to you once we know about your requirement.
3.Shipment can be arranged from our port to your destination port.
4.Opetion video can be sent to you if needed.
5.Maintenance video will be given once the aerial man lift platform break down to help you repair.
6.Parts of aerial man lift platform can be sent to you by express within 7 days if needed.
Frequently Asked Questions:
1.How can customer buy parts once it break down?
The aerial man lift platform adopt most of the common parts of hardware.You can buy the parts in your local hardware market.
2.How can customer repair the aerial man lift platform?
One of the great advantage of the equipment is with very very low failure rate.Even it breaks down,we can guide to repair it by video and repair instruction.
3.How long is the quality guarantee?
One year quality guarantee.If it breaks down within one year,we can send the parts free of charge to you.
Certificate:ISO and CE
Company Introduction:
Qingdao Sinofirst Machinery Co.,Ltd is specialized in Aerial Work Platform and Material Lift Platform.SINOFIRST is established in 2000 with
great experience in manufacturing and exporting.SINOFIRST facotry covers more than 300 acres and a building area of up to 10,000m2.
SINOFIRST is famous for high-end aerial equipment.Each year, we invest more than 10 million to develop new technology and new products.
Great development and research team guarantee the high quality of SINOFIRST produdcts.Now Sinofirst products are widely used in all over
the world. After service certer is under contruction in foreign countries.
Contact Information:
Lilo Zhou
Qingdao Sinofirst Machinery Co., Ltd